Главная Products Assembly of water-lifting equipment

Assembly of water-lifting equipment, pumping equipment in artesian wells, pump assembly

Attention: open in a new window. PDFPrint

The assembly of water-lifting equipment envisages two stages:

  • assembly of pumping equipment in the well;
  • assembly of equipment in the engineering and utility services room.

Before starting assembling works, it is important to select correctly the pumping equipment, proceeding from the well parameters. Otherwise, the expensive equipment will fail, leaving the owner without water.

The pump is the “heart” of the well.

The simplest diagram of assembly of the pumping equipment is shown on fig. 1

The water supply company “Burvod” collaborates with the followings suppliers obutsrojstvoand producers of pumping equipment:

  • Saer (Italy) 
  • Pedrolo (Italy) 
  • Calpeda (Italy) 
  • Willo (Germany) 
  • Grundfos (Germany)
  • As well as domestic producers

 



По-русскиУкраїнськоюEnglish
What are tectonic motions?

 

Tectonic motions  are name moving of separate blocks of the earth's crust in relation to each other. Distinguish the different types of tectonic motions : pulsations, or general vibrations; general raising and lowering, складкообразовательные and break.

Borehole archive

См?ртЪ сп@мерам

Вход